Item added to Favourites.
Item removed from Favourites.
URL was copied to clipboard.
Object
FOURNITURE ET POSE DE LA FIBRE OPTIQUE ENTRE LE POSTE DE SECTIONNEMENT M-18 ET LE POSTE DE SECTIONNEMENT M-22
Bidding Deadline
Nov. 10, 2025, noon
Remaining days
5
days
Total Estimate
5,398,140.00
Provisional guarantee
Main Category
Fournitures
Reserved for SMB+
No
Execution Location
LARACHE, OUEZZANE
Public Client
Procedure
Appel d'offres ouvert
Online bidding
Required, e-Signature Required
Domains of Activity
- — Fournitures / Matériel informatique, logiciels et pièces de rechanges / Matériel et équipements informatiques
- — Fournitures / Matériel technique, de lutte contre l’incendie et pièces de rechange / Matériel technique
Samples
In-Site Visits
Withdrawal Address
Bidding Address
Opening Address
Contact